initially, the larger, flat surfaces in the tiles sagged a lot
to solve the problem
small "support- coils" placed in the moulds
half-filled with slip
before the back of the moulds were closed
and filled
two drainage holes to stop any suction when moulds are emptied
tiles high fired and stacked
counted, packed and numbered
ready for delivery and installation tomorrow morning
No comments:
Post a Comment